Natural Gas Station

Initial Inspection of Natural Gas Station / CE Marking
European Directive 2014/68/EU (PED)

The initial inspection of the installation of a natural gas station is subject to inspection as pressure equipment. Conformity assessment is performed on the basis of unit verification, including auditing the correct preparation of the technical files and the correct completion of the necessary tests in the presence of experienced ERGOCERT inspectors.